(575) 687 - 2506

Past Projects
These are some pictures of our past jobs. Check back regularly for updates. All jobs shown here are performed by our parent company
Triangle - S - Construction
License # 27076
Skywater SubdivisionSkywater Subdivision
Time to get on the road.Time to get on the road.
Skywater SubdivisionSkywater Subdivision
Lets get this dozer loaded.Lets get this dozer loaded.
Skywater SubdivisionSkywater Subdivision
Just arrived ready to get to workJust arrived ready to get to work
Skywater SubdivisionSkywater Subdivision
Starting on some roadsStarting on some roads
Skywater SubdivisionSkywater Subdivision
Ripping those rocks out.Ripping those rocks out.
Skywater SubdivisionSkywater Subdivision
Large culvisack. Day 3Large culvisack. Day 3
Skywater SubdivisionSkywater Subdivision
Turn at top of subdivision.Turn at top of subdivision.
Gabion Rock for contractorGabion Rock for contractor
Trucks loaded and ready for delivery.Trucks loaded and ready for delivery.
Gabion Rock for contractorGabion Rock for contractor
Truck getting weighed out to start trip for delivery.Truck getting weighed out to start trip for delivery.
Gabion Rock for ContractorGabion Rock for Contractor
Starting delivery of Gabion Rock for contractor.Starting delivery of Gabion Rock for contractor.
Gabion Rock Production for ContractorGabion Rock Production for Contractor
Produceing and delivering 1,500 tons of Gabion Rock.Produceing and delivering 1,500 tons of Gabion Rock.
USFS Well HouseUSFS Well House
Well house at beginning.Well house at beginning.
USFS Well HouseUSFS Well House
Insulation and paper installed, Ready for metal.Insulation and paper installed, Ready for metal.
USFS Well HouseUSFS Well House
Completed well house, All metal and insulation installedCompleted well house, All metal and insulation installed
USFS Well HouseUSFS Well House
On to the next job!On to the next job!
Mexican Canyon TrestleMexican Canyon Trestle
Erosion control rock.Erosion control rock.
Mexican Anyon TrestleMexican Anyon Trestle
Erosion control rock.Erosion control rock.
Mexican Canyon TrestleMexican Canyon Trestle
Erosion control, Install rip rap to help keep deceleration lane from eroding.Erosion control, Install rip rap to help keep deceleration lane from eroding.
Mexican Canyon TrestleMexican Canyon Trestle
Erosion control rip rap installed in one day.Erosion control rip rap installed in one day.
Wilbanks Ropeing ArenaWilbanks Ropeing Arena
Getting Extec screen ready for transport to Wilbanks ropeing arena. Thanks to Mr. Bills Transport.Getting Extec screen ready for transport to Wilbanks ropeing arena. Thanks to Mr. Bills Transport.
Wilbanks Ropeing ArenaWilbanks Ropeing Arena
Conveyor #1 ready for transport.Conveyor #1 ready for transport.
Wilbanks Ropeing ArenaWilbanks Ropeing Arena
Extec screen setup and ready for conveyors.Extec screen setup and ready for conveyors.
Wilbanks Ropeing ArenaWilbanks Ropeing Arena
Conveyors set up and ready for screening sand.Conveyors set up and ready for screening sand.
Mexican Canyon TrestleMexican Canyon Trestle
Installing erosion control rocks day 1.Installing erosion control rocks day 1.
Mexican Canyon TrestleMexican Canyon Trestle
Erosion control rocks day 2 startErosion control rocks day 2 start
Mexican Canyon TrestleMexican Canyon Trestle
Erosion control rocks day 3 install complete 375 linear feet exactly.Erosion control rocks day 3 install complete 375 linear feet exactly.
Mexican Canyon TrestleMexican Canyon Trestle
Erosion control rocks day 3 install complete.Erosion control rocks day 3 install complete.
Mexican Canyon TrestleMexican Canyon Trestle
Tractor loaded and off to the next job.Tractor loaded and off to the next job.
Bonito Lake, CXT ToiletBonito Lake, CXT Toilet
Before construction began.Before construction began.
Bonito Lake, CXT ToiletBonito Lake, CXT Toilet
First day of install, construct holes for vaults very crucial to get depths correct on this part think of drainage and heigth of vaults plus aggregate bedding and sand.First day of install, construct holes for vaults very crucial to get depths correct on this part think of drainage and heigth o...
Bonito Lake, CXT ToiletBonito Lake, CXT Toilet
Bedding layer of aggregate base course material.Bedding layer of aggregate base course material.
Bonito Lake, CXT ToiletBonito Lake, CXT Toilet
Getting good compaction of base course before starting sand.Getting good compaction of base course before starting sand.
Bonito Lake, CXT ToiletBonito Lake, CXT Toilet
Leveled sand ready for vaults to be set and then compaction around the vaults can be started.Leveled sand ready for vaults to be set and then compaction around the vaults can be started.
Bonito Lake, CXT ToiletBonito Lake, CXT Toilet
Toilet being delivered to site.Toilet being delivered to site.
Bonito Lake, CXT ToiletBonito Lake, CXT Toilet
First vault getting rigged to be set.First vault getting rigged to be set.
Bonito Lake, CXT ToiletBonito Lake, CXT Toilet
First vault set.First vault set.
Bonito Lake, CXT ToiletBonito Lake, CXT Toilet
Both vaults set compaction starte, lifts must be 8 inches or less.Both vaults set compaction starte, lifts must be 8 inches or less.
Bonito Lake, CXT ToiletBonito Lake, CXT Toilet
Building getting rigged.Building getting rigged.
Bonito Lake, CXT ToiletBonito Lake, CXT Toilet
Building ready to be set.Building ready to be set.
Bonito Lake, CXT ToiletBonito Lake, CXT Toilet
Building set now finish compaction and ready for back fill and concrete slab.Building set now finish compaction and ready for back fill and concrete slab.
Mexican Canyon TrestleMexican Canyon Trestle
Reclaiming Access road and installing Rip RapReclaiming Access road and installing Rip Rap
Mexican Canyon TrestleMexican Canyon Trestle
Removing excess debris from area mostly roots and unwanted foliage.Removing excess debris from area mostly roots and unwanted foliage.
Mexican Canyon TrestleMexican Canyon Trestle
Rip Rap install completed ready for USFS inspection.Rip Rap install completed ready for USFS inspection.
Mexican Canyon TrestleMexican Canyon Trestle
Mr. Bill cleaning up after the job is done makeing sure we leave the place looking as good as it did when we arrived.Mr. Bill cleaning up after the job is done makeing sure we leave the place looking as good as it did when we arrived.
Mexican Canyon TrestleMexican Canyon Trestle
Building terraces for drill rig. USFS jobBuilding terraces for drill rig. USFS job
USFS Hose RackUSFS Hose Rack
Replaceing rotted boards for hose cleaning rack at USFS admin officesReplaceing rotted boards for hose cleaning rack at USFS admin offices
Pond ConstructionPond Construction
Construction of large ponds for land owner.Construction of large ponds for land owner.
Pond ConstructionPond Construction
Construction of large ponds for land owner.Construction of large ponds for land owner.
Forest Service ContractForest Service Contract
Building road for USFS.Building road for USFS.
Anytime, Anywhere, Any TerrainAnytime, Anywhere, Any Terrain
showing our excavating ability, We can complete any project anywhere. and this is proofshowing our excavating ability, We can complete any project anywhere. and this is proof
Timberon Fire 2016Timberon Fire 2016
Map of burnt area.Map of burnt area.
Timberon Fire 2016Timberon Fire 2016
Blading the roads.Blading the roads.
Timberon Fire 2016Timberon Fire 2016
Burnt pickup.Burnt pickup.
Timberon Fire 2016Timberon Fire 2016
Burnt Fire TruckBurnt Fire Truck
Timberon Fire 2016Timberon Fire 2016
Total amount of roads bladed.Total amount of roads bladed.
BluewaterBluewater
Making road repairs.Making road repairs.
Angel Fire 2016 706 and 5Angel Fire 2016 706 and 5
Palo Flechado pass. NFSRD 5 is in the right hand corner of the picture. We hauled over 3000 tons into this road.Palo Flechado pass. NFSRD 5 is in the right hand corner of the picture. We hauled over 3000 tons into this road.
Angel Fire 2016 706 and 5Angel Fire 2016 706 and 5
First of three loads of culverts! We installed a total of 41 culverts in 7 days.First of three loads of culverts! We installed a total of 41 culverts in 7 days.
Angel Fire 2016 706 and 5Angel Fire 2016 706 and 5
Culvert install, compaction!Culvert install, compaction!
Angel Fire 2016 706 and 5Angel Fire 2016 706 and 5
Culvert install.Culvert install.
Angel Fire 2016 706 and 5Angel Fire 2016 706 and 5
Final compaction to top of culvert.Final compaction to top of culvert.
Angel Fire 2016 706 and 5Angel Fire 2016 706 and 5
On to the next culvert guys!On to the next culvert guys!
Angel Fire 2016 706 and 5Angel Fire 2016 706 and 5
Start getting BC on this road!Start getting BC on this road!